Saturday, November 18, 2006





On Nov. 14th, Webb Concrete got the basement floor poured and Larry Federspiel got all the back filling done so it is starting to take shape. Larry had to bring in about 10 loads of black dirt to fill in the front stoop area. Next week will be a big progress week. The basement floor gets poured as well as the well getting drilled, septic put in, and Doug, our builder, starts. The first picture is a front shot of the house and gargage from the street, the second it a top view from the garage wall I was standing on, the last two shots are of the house from the back side. One is the left side and one the right side views.